During a 2 week period in July 2003 the
weather finally gave us a break. The preparation of digging the drainage
trench
deep left only a shallow water depth that was quickly pumped out. Due to
the heavy clay content of the soil the
heavy equipment was able to get back in with in a week of pumping the area
dry.